Newsletter Sign-up

* indicates required

Nippon Renewable Energy (NRE)

Shichinohe III, Japan Ground-mounted l 12.7 MW capacity

The Nippon Renewable Energy KK (NRE) solar installation had to be built under a very specific structural design with a total of 29,184 mounting poles, some over 6 meters long.       

The extreme wind and snow in the area requires excellent racking system design and material quality. In the summer of 2015, our company partnered with ForShine Mechanics to support the installation with their skilled ramming, drilling and racking installation teams. The instructors and site managers from Europe were very much impressed that the multi-national team was able to keep a ramming average of above 450 standard poles per machine per working day. The drilling team and the “special team” for the long rear poles with European instructors and Japanese operators had special equipment shipped to Aomori prefecture and finished their work long before the project deadline. 

This system now generates green energy on former swamp land and will withstand the extreme weather conditions, due to its excellent racking system and immaculate installation.

Installation of Shichinohe japan solar PV project